South Eastern Coalfields Limited

  • Objective

    The project focused on supplying ERW MS Black Pipes to South Eastern Coalfields Limited for centralised consumption. The goal was to ensure the timely delivery of high-quality pipes adhering to industry standards, supporting critical operations.

  • animation-w4Challenges

    The project presented the following challenges:

    • Supplying ₹5.47 Crore worth of ERW MS Black Pipes within a strict timeline.
    • Ensuring compliance with IS:1239 and IS:3589 standards for industrial-grade applications.
    • Passing inspections conducted at designated storage facilities to meet quality benchmarks.

  • Solutions

    Utkarsh India addressed these challenges by:

    • Precision Manufacturing: Produced ERW MS Black Pipes adhering to IS:1239 and IS:3589 standards, ensuring suitability for centralised consumption and long-term performance.
    • Rigorous Quality Assurance: Conducted comprehensive inspections at every stage of production and final quality checks at storage facilities.
    • Timely Delivery: Optimised production schedules and logistics to ensure the on-time delivery of pipes, meeting the client’s operational requirements.

  • animation-w4Conclution

    Utkarsh India successfully delivered ₹5.47 Crore worth of ERW MS Black Pipes to South Eastern Coalfields Limited within the stipulated timeframe. This project underscored our expertise in delivering reliable, high-quality infrastructure solutions tailored to the needs of industrial clients.