South Eastern Coalfields Limited
-
Objective
The project focused on supplying ERW MS Black Pipes to South Eastern Coalfields Limited for centralised consumption. The goal was to ensure the timely delivery of high-quality pipes adhering to industry standards, supporting critical operations.
-
Challenges
The project presented the following challenges:
- Supplying ₹5.47 Crore worth of ERW MS Black Pipes within a strict timeline.
- Ensuring compliance with IS:1239 and IS:3589 standards for industrial-grade applications.
- Passing inspections conducted at designated storage facilities to meet quality benchmarks.
-
Solutions
Utkarsh India addressed these challenges by:
- Precision Manufacturing: Produced ERW MS Black Pipes adhering to IS:1239 and IS:3589 standards, ensuring suitability for centralised consumption and long-term performance.
- Rigorous Quality Assurance: Conducted comprehensive inspections at every stage of production and final quality checks at storage facilities.
- Timely Delivery: Optimised production schedules and logistics to ensure the on-time delivery of pipes, meeting the client’s operational requirements.
-
Conclution
Utkarsh India successfully delivered ₹5.47 Crore worth of ERW MS Black Pipes to South Eastern Coalfields Limited within the stipulated timeframe. This project underscored our expertise in delivering reliable, high-quality infrastructure solutions tailored to the needs of industrial clients.