Shiv Kumar Singh – Sonebhadra Section, CAR-CPU Doubling Project, PRYJ Division, NCR
-
Objective
The project involved the supply of mast, TTC, portal, and SPS structures for the Sonebhadra section in connection with the doubling of the CAR-CPU section under the PRYJ division of North Central Railway (NCR). The objective was to support the 2x25 KV AC electrification system, ensuring enhanced rail capacity and operational efficiency.
-
Challenges
This railway electrification project posed significant challenges, including:
- Strict delivery timelines to align with the doubling project schedule.
- Ensuring compliance with IS2062/E250 technical standards for mast, TTC, portal, and SPS structures.
- Managing electrification across 202.57 KM and 168.20 KM, demanding efficient planning and execution.
-
Solutions
Utkarsh India successfully navigated these challenges by implementing:
- Precision Engineering: Manufactured mast, TTC, portal, and SPS structures as per IS2062/E250 standards, ensuring longevity and performance.
- Efficient Supply Chain Management: Optimised logistics and production schedules to ensure timely delivery of materials.
- Rigorous Quality Control: Conducted multi-stage inspections to maintain compliance with railway safety and electrification standards.
-
Conclution
Utkarsh India played a pivotal role in the electrification of the Sonebhadra section, supplying high-quality mast, TTC, portal, and SPS structures to support the CAR-CPU doubling project. This contribution reinforced our commitment to delivering advanced railway electrification solutions that support India’s growing railway network.