NTPC Tamil Nadu Energy Co. Ltd.

  • Objective

    The project focused on the supply of ERW MS Black and GI Pipes for the Vallur Thermal Power Project, supporting its infrastructure with high-quality materials. The goal was to deliver pipes that ensured long-term performance while adhering to the prescribed standards and timelines.

  • animation-w4Challenges

    The project posed the following challenges:

    • Meeting the stringent quality standards outlined in IS:1239 and IS:3589.
    • Ensuring third-party inspection compliance before delivery.
    • Completing the supply within the designated timeframe, maintaining consistency across multiple consignments.

  • Solutions

    Utkarsh India successfully addressed these challenges by:

    • Precision Manufacturing: Produced ERW MS Black and GI Pipes adhering to IS:1239 and IS:3589 standards to ensure reliability and long-term performance.
    • Quality Assurance: Conducted thorough inspections at every stage of production, including final third-party inspections, to guarantee compliance with industry standards.
    • Timely Delivery: Streamlined logistics and efficient production schedules enabled the on-time delivery of pipes within the stipulated timeframe.

  • animation-w4Conclution

    Utkarsh India supplied high-quality ERW MS Black and GI Pipes worth ₹2.54 Crore to NTPC Tamilnadu Energy Co. Ltd., meeting the stringent quality and performance requirements of the Vallur Thermal Power Project. This accomplishment reinforced our commitment to delivering infrastructure solutions that combine quality, reliability, and timeliness.