Objective
To enhance the infrastructure at Korba Super Thermal Power Station, this project focused on supplying 6 MTRS and 9 MTRS octagonal poles for improved operational efficiency and safety.
-
Challenges
The project required the production of 305 octagonal poles with precise specifications, as outlined in the approved drawings and technical data sheets (TDS). Additional challenges included:
- Separate inspections for materials and PU painting by distinct agencies.
- Meeting tight timelines while ensuring stringent quality standards.
- Final inspections conducted by TCS Ltd., adding an extra layer of scrutiny.
-
Solutions
Utkarsh India produced the poles across two production units, leveraging advanced facilities to meet the client’s requirements. Key measures included:
- Ensuring compliance with approved drawings and TDS for the octagonal poles.
- Conducting separate inspections for materials and PU painting to maintain high quality standards.
- Coordinating production at both plants to deliver the materials within the stipulated timeline on a war footing basis.
- Facilitating final inspections by TCS Ltd., ensuring complete client satisfaction.
-
Conclution
Utkarsh India successfully delivered 305 octagonal poles within the specified time frame, contributing to the operational efficiency of Korba Super Thermal Power Station. By adhering to strict quality assurance protocols and meeting tight deadlines, we reaffirmed our commitment to excellence in infrastructure projects.