  • Objective

    The objective of this project was to enhance road safety on the Lucknow-Ayodhya Expressway (NH-27) by implementing a robust safety solution with the installation of 35,000 metres of W-Beam Metal Crash Barriers. The project required the timely delivery and installation of barriers within a strict 7-day timeframe, while ensuring quality assurance, compliance with safety regulations, and the provision of Material Test Certificates (MTC) along with the necessary vehicles for installation.

  • animation-w4Challenges

    • Short Time Frame: The project required the delivery and installation of 35,000 metres of W-Beam SSSB within just 7 days, posing a significant logistical challenge.
    • Timely Delivery and Coordination: Coordinating the delivery of large quantities of materials and ensuring the installation vehicles were available and ready for operation was a critical challenge that needed precise planning.
    • Quality Assurance: Despite the compressed timeline, it was essential to maintain quality assurance standards to ensure the materials used met safety and regulatory requirements.
    • Logistics and Installation: The project involved coordinating the transportation and installation of materials, ensuring that everything arrived on-site and was installed without delays.

  • Solutions

    • On-Time Delivery and Installation: Through meticulous planning and efficient logistics, Shreeji Infrastructure ensured that all 35,000 metres of W-Beam SSSB were delivered and installed within the strict 7-day deadline.
    • Quality Assurance: Each batch of W-Beam barriers was subjected to stringent quality checks to ensure compliance with safety standards. The materials used were inspected thoroughly to meet the highest industry requirements.
    • MTC and Documentation: Every shipment was accompanied by the required Material Test Certificates (MTC), ensuring that all materials met the regulatory and safety standards specified for the project.
    • Efficient Logistics and Coordination: The installation process was carefully coordinated to minimise delays and ensure a smooth workflow. The timely arrival of materials and installation vehicles was managed seamlessly to ensure no disruptions during the installation process.

  • animation-w4Conclution

    The successful installation of 35,000 metres of W-Beam Metal Crash Barriers along the Lucknow-Ayodhya Expressway (NH-27) within 7 days demonstrated Shreeji Infrastructure's ability to meet tight deadlines without compromising on quality. This project enhanced the safety features of NH-27 and reinforced the company’s commitment to delivering timely, high-quality solutions for large-scale infrastructure projects, ensuring the road's safety standards were met without delay.