Bharat Petroleum Corporation Limited
-
Objective
The project aimed to supply ERW MS GI Pipes for Bharat Petroleum Corporation Limited’s Base Oil Thermal Rasayani & Malkapur installation projects. The goal was to deliver high-quality pipes within the stipulated timeframe to support the critical infrastructure needs of these installations.
-
Challenges
The project presented the following challenges:
- Supplying ₹3.52 Crore worth of ERW MS GI Pipes within a strict timeline.
- Ensuring compliance with IS:1239 and IS:3589 standards for industrial-grade applications.
- Meeting the client’s requirements for third-party inspections at various stages.
-
Solutions
Utkarsh India successfully addressed these challenges by:
- Precision Manufacturing: Produced ERW MS GI Pipes conforming to IS:1239 and IS:3589 standards, ensuring reliability and durability for the project’s infrastructure requirements.
- Rigorous Quality Assurance: Conducted detailed inspections, including third-party checks, at multiple stages of production to ensure adherence to quality benchmarks.
- Timely Delivery: Leveraged efficient production scheduling and streamlined logistics to deliver the pipes within the specified timeframe, aligning with the client’s operational schedule.
-
Conclution
Utkarsh India delivered ₹3.52 Crore worth of ERW MS GI Pipes to Bharat Petroleum Corporation Limited, meeting all quality and timeline requirements. This project demonstrated our capability to provide reliable and high-quality solutions for critical industrial installations, strengthening our position as a trusted partner in the energy sector.