ABCI-SCPL-SIPS (JV) – New Pradhankhunta Yard, Dhanbad Division, East Central Railway

  • Objective

    The project involved the supply of mast and dwarf mast structures for railway electrification at the New Pradhankhunta Yard, in connection with the construction of a 3rd and 4th double-line track in the Dhanbad Division of East Central Railway. This initiative aimed to enhance rail infrastructure capacity and efficiency.

  • animation-w4Challenges

    This railway electrification project presented several challenges, including:

    • Ensuring on-time delivery of electrification structures to align with the railway’s expansion schedule.
    • Meeting IS2062/E250 standards for mast and dwarf mast structures.
    • Managing electrification across approximately 39.00 KM, requiring precise coordination of material supply and logistics.

  • Solutions

    Utkarsh India successfully addressed these challenges through:

    • Precision Manufacturing: Produced mast and dwarf mast structures in strict adherence to IS2062/E250 standards, ensuring durability and compliance with railway specifications.
    • Optimised Logistics Management: Streamlined production schedules and transportation to ensure timely delivery and seamless integration with the project timeline.
    • Stringent Quality Control: Conducted multi-stage inspections to uphold high standards of safety and performance in railway electrification.

  • animation-w4Conclution

    Utkarsh India played a crucial role in the electrification of the New Pradhankhunta Yard, supplying mast and dwarf mast structures for the 3rd and 4th double-line track expansion in the Dhanbad Division. This project reinforced our ability to deliver high-quality electrification solutions, contributing to enhanced rail infrastructure and operational efficiency.