TRAXUN-SCR-KEE (JV) – Panvel-Karjat Section, Central Railway
-
Objective
The project involved the supply of mast, TTC, portal, and SPS structures for railway electrification in the Panvel-Karjat section of Central Railway, as part of a new suburban corridor. This project was crucial in enhancing electrified railway infrastructure and improving commuter connectivity.
-
Challenges
The railway electrification project posed several challenges, including:
- Delivering the required structures within the stipulated timeframe to align with the suburban corridor development schedule.
- Ensuring compliance with IS2062/E250 standards for mast, TTC, portal, and SPS structures.
- Managing a large-scale electrification covering 30 RKM/88 TKM, demanding seamless coordination of production and logistics.
-
Solutions
Utkarsh India addressed these challenges with:
- Precision Engineering: Manufactured mast, TTC, portal, and SPS structures in strict accordance with IS2062/E250 standards, ensuring structural reliability.
- Timely Execution: Implemented an optimised supply chain strategy, ensuring the on-time delivery of all electrification components.
- Stringent Quality Control: Conducted multiple quality checks at each stage of production to ensure compliance with railway electrification safety standards.
-
Conclution
Utkarsh India successfully contributed to the electrification of the Panvel-Karjat section, supplying high-quality mast, TTC, portal, and SPS structures within the scheduled timeframe. Our role in this project reinforced our reputation as a trusted provider of railway electrification solutions, enabling efficient and modern rail infrastructure development.