  • Objective

    The project aimed to install a Carport Solar Structure at Maruti Suzuki’s facility in Sonipat, facilitating solar power generation, utilization, and EV charging infrastructure. This initiative was part of a sustainable energy transition, integrating renewable energy solutions with vehicle charging stations.

  • animation-w4Challenges

    The project posed key challenges, including:

    • Strict delivery timelines, requiring the supply and installation of 1,742 MT of solar structures within 60 days.
    • Ensuring compliance with technical specifications, using HR Coil and Zam-coated materials.
    • Coordinating logistics, ensuring timely delivery, quality assurance, and Material Test Certificates (MTC) along with the vehicle.

  • Solutions

    Utkarsh India successfully addressed these challenges by:

    • Precision Manufacturing: Designed and fabricated 2mm thickness Carport Solar Structures (Column Post Clip) for optimised load-bearing and durability.
    • Efficient Logistics & Delivery Management: Streamlined production and dispatch operations to meet the strict 60-day deadline.
    • Quality Assurance & Compliance: Conducted rigorous quality inspections at every stage to ensure technical accuracy and durability.
    • Manpower Allocation: Deployed a skilled workforce to ensure seamless execution and timely installation.

  • animation-w4Conclution

    Utkarsh India played a crucial role in supporting Tata Power Solar Systems Limited’s renewable energy mission by delivering high-quality solar structures on time. This project strengthens the integration of solar power with EV infrastructure, reinforcing our commitment to sustainable and efficient energy solutions.

enquiries Icon Image Have enquiries? Drop them here..

By submitting this form I agree to the T & C, Privacy Policy and receiving SMS & WhatsApp communication.