Supply and Commissioning of 20 MTRS High Mast for Kolaghat Thermal Power Station

  • Objective

    To support the infrastructure needs of the Kolaghat Thermal Power Station by supplying and commissioning 20-metres high mast poles. The project aimed to enhance the station’s lighting and security systems by providing reliable, high-quality, and durable lighting solutions that met the technical and compliance standards of the West Bengal Power Development Corporation Ltd. (WBPDCL).

  • animation-w4Challenges

    • Site Clearance and Approvals: The project required proper site clearance and multiple rounds of approval for drawings and technical data sheets (TDS), which could delay the execution if not carefully managed.
    • Timely Execution: Completing the project within the stringent timelines, ensuring all components, including outsourced materials, were synchronised for timely delivery and commissioning.
    • Coordination of Multiple Stakeholders: The successful execution depended on efficient coordination with various stakeholders, including WBPDCL’s engineering team, outsourced vendors, and the QC engineers.
    • Foundation Preparation: Preparing the foundation at all sites in advance to ensure timely commissioning without delays.

  • Solutions

    • Efficient Approval Process: Ensured that the drawings and TDS were prepared, reviewed, and approved in a timely manner to prevent project delays. This was managed through close communication with WBPDCL and the client’s QC department.
    • Synchronised Procurement and Delivery: All outsourced materials were procured and delivered in a synchronised manner to ensure that production and installation went ahead smoothly without any supply chain issues.
    • Advanced Foundation Work: The foundation preparation for all 14 high mast poles was carried out well in advance, ensuring the site was ready for installation. This proactive approach minimised delays during the execution phase.
    • Timely Commissioning: The project was completed within the required timeline, with successful commissioning of all 14 high mast poles, ensuring that the Kolaghat Thermal Power Station received fully operational lighting solutions without delay.

  • animation-w4Conclution

    The project was a resounding success, with all 14 high mast poles delivered and commissioned on time at Kolaghat Thermal Power Station. The timely completion of the project was made possible through meticulous planning, effective coordination, and proactive foundation work. By adhering to the approved drawings, TDS, and project timelines, we ensured that the installation met the high standards required by WBPDCL. The project highlights our capability in managing complex infrastructure projects with multiple stakeholders and ensuring quality execution within tight deadlines.