Odisha Mining Corporation
-
Objective
The project focused on supplying ERW MS Black Pipes to Odisha Mining Corporation for use at the Kaliapani and South Kaliapani sites. The goal was to deliver high-quality pipes that ensure long-term performance, meeting the client’s operational needs within the stipulated timeframe.
-
Challenges
The project posed the following challenges:
- Delivering ₹2.96 Crore worth of ERW MS Black Pipes within a strict timeline.
- Adhering to IS:3589 standards for industrial-grade applications.
- Ensuring quality compliance through inspections conducted at designated storage facilities.
-
Solutions
Utkarsh India effectively addressed these challenges through:
- Precision Manufacturing: Produced ERW MS Black Pipes adhering to IS:3589 standards, ensuring durability and suitability for mining operations.
- Rigorous Quality Assurance: Conducted comprehensive inspections at every stage of production and final quality checks at storage facilities to meet client requirements.
- Timely Delivery: Streamlined production and logistics processes ensured on-time delivery of pipes to both Kaliapani and South Kaliapani sites.
-
Conclution
Utkarsh India successfully delivered ₹2.96 Crore worth of ERW MS Black Pipes to Odisha Mining Corporation, supporting the client’s infrastructure needs at Kaliapani and South Kaliapani. This project underscored our ability to deliver high-quality, reliable solutions for critical mining operations within strict deadlines.