Installation of Thrie Beam Metal Crash Barriers for Elevated Highway, Tamil Nadu

  • Objective

    The main objective of the project was to enhance road safety for the Elevated Highway in Tamil Nadu by installing 6,000 metres of Thrie Beam Metal Crash Barriers along the Coimbatore City stretch. The project aimed to deliver high-quality safety barriers within a tight deadline of 21 days. Along with the timely delivery, the installation process had to comply with all quality standards, ensure safety regulations, and deliver MTC (Material Test Certificates) along with the vehicles required for installation.

  • animation-w4Challenges

    • Strict Timeline: The project demanded delivery and installation of 6,000 metres of Thrie Beam Metal Crash Barriers within a strict 21-day deadline, posing a challenge to the project timeline.
    • Timely Delivery and Coordination: Coordinating the timely transportation of materials and ensuring that installation teams were ready to execute the installation across Coimbatore City required careful planning.
    • Quality Assurance: Maintaining strict quality assurance was essential to ensure that all materials met safety standards. The materials had to pass thorough inspections and regulatory cheques, even with the limited timeframe.
    • Logistics and Installation: The project involved managing the delivery of large quantities of materials and coordinating the necessary vehicles for installation, ensuring that everything arrived on-site in time for installation without delays.

  • Solutions

    • On-time Delivery and Installation: With effective logistical coordination and careful scheduling, we successfully delivered and installed 6,000 metres of Thrie Beam SSSB within the 21-day deadline. The project was completed smoothly through the precise coordination of materials and installation teams.
    • Quality Control: Each batch of Thrie Beam barriers underwent thorough quality checks to ensure that the materials met the regulatory and safety standards. Strict quality assurance procedures were followed, ensuring that the installation complied with the highest standards of safety.
    • MTC and Documentation: Material Test Certificates (MTC) were provided for every delivery to ensure transparency and compliance with the required specifications. The MTCs confirmed that all materials used met the necessary quality and regulatory standards.
    • Efficient Logistics and Coordination: Efficient logistics ensured the timely arrival of materials and installation vehicles on-site. Coordination between teams was vital to ensure that installation began immediately after the materials arrived, minimising delays and allowing the project to progress without disruption.

  • animation-w4Conclution

    The successful installation of 6,000 metres of Thrie Beam Metal Crash Barriers along the Elevated Highway in Coimbatore City, Tamil Nadu was completed within the 21-day timeframe, showcasing our ability to meet stringent deadlines. The project was executed with high levels of quality assurance and regulatory compliance, ensuring the safety of road users and enhancing the overall infrastructure of Tamil Nadu’s elevated highway. This achievement underscores KNR Construction Limited's commitment to delivering quality safety solutions in a timely manner for large-scale infrastructure projects.