Ilios Power Private Limited
-
Objective
The project aimed to supply and install Mild Steel Members for NHPC’s NP Kunta Solar Power Project in Anantapur, enhancing solar power generation, utilisation, and EV charging infrastructure. The installation was part of NHPC’s renewable energy expansion efforts.
-
Challenges
The project presented key challenges, including:
- Strict delivery timelines, requiring the supply and installation of 397 MT of mild steel components within 45 days.
- Ensuring technical compliance, particularly with HR Coil material in 2MM & 2.5MM thickness specifications.
- Maintaining quality standards, ensuring timely delivery, adherence to quality norms, and inclusion of Material Test Certificates (MTC) along with the vehicle.
-
Solutions
Utkarsh India successfully addressed these challenges by:
- Precision Manufacturing: Fabricated high-quality Mild Steel Members using HR Coil, ensuring structural integrity, durability, and efficiency.
- Optimised Logistics & Supply Chain: Streamlined material procurement, production, and dispatch operations to meet the 45-day project deadline.
- Strict Quality Control Measures: Conducted multi-stage inspections, ensuring compliance with industry and client standards.
- Efficient Workforce Deployment: Assigned skilled professionals to oversee the manufacturing and installation process, ensuring seamless execution.
-
Conclution
Utkarsh India successfully delivered Mild Steel Members for Ilios Power Private Limited, supporting NHPC’s solar power expansion in Anantapur. This project played a crucial role in reinforcing India’s renewable energy infrastructure, aligning with national sustainability goals.